JeffOtto.com Menus JeffOtto.com Menus


Register For ITEC's Free Electricity Program

Nikola Tesla

Introducing The International Tesla Electric Company

Utility Company of Better World Technologies

Nikola Tesla

Please Note The Facts:

    Better World Technologies (BWT) believes they have the ability to produce an electric generator that will produce more electricity than it will consume, thus Free Electricity. BWT conducted a nationwide tour in 1999 to demonstrate one half of this technology the Hummingbird Motor (the driver) proven to be 100% efficient. In 2001 BWT conducted another nationwide tour to demonstrate the second half of this technology, the Sundance Generator, proven to produce five units of mechanical energy for each unit consumed (1 in 5 out). Both tours were heavily advertised and invited anyone to bring their own test equipment to disprove the above technologies - Many experts came and NOT ONE disproved either technology (all demonstrations were video taped).

    Better World Technologies further believes they can combine the Hummingbird Motor with the Sundance Generator to produce "Free Electricity". BWT does not claim to have a Free Electricity generator and have not, to date, combined the Hummingbird to the Sundance. Due to the suppression of technology by Corporate America, BWT will not come forward until a critical mass of public awareness is achieved. Once 1.6 million people of North America has been registered for this program and agreed to be a witness at our demonstrations, BWT will produce 100 units to be demonstrated nationwide. These demonstrations will be held at the same time across America in sports stadiums and large public meeting places.

    In appreciation to these first 1.6 million witnesses, the International Tesla Electric Company (BWT's utility company) will provide up to 26,000 kWh of free electricity per year for as long as ITEC is able to sell the excess electricity on the open market. This is our way of rewarding these witnesses for their faith in God, His technology and us. After the technology has been publicly demonstrated and proven to the world the remaining 14.4 million units planned for distribution to North America will be made available to the public at a projected cost of $2,000.00 per registrant.

    The unit is not now for sale and will never be made available for sale but will remain the property of BWT and ITEC. Those fortunate enough to be registered with ITEC will receive the 26,000 kWh per year absolutely free for as long as ITEC is able to sell the excess electricity on the open market.

    There are three options to register now as a witness, this offer will be withdrawn without prior notice once BWT announces it has achieved the initial 1.6 million witness goal and the initial demonstrations will be scheduled. All registrants will be notified by mail of the time and date of the demonstration closest to their location. We thank you for your patience, your faith and your support, there is a periodic update you may subscribe to here authored by this UCSA dealer. There is also a periodic updated phone recording by Dennis Lee you may listen to at 212-461-8738.

The details of our current offer follows...


UPDATE: Yes the "Free Electricity" program is still very much alive and all registrants The International Tesla Electric Corporation (ITEC) has current contact information for will be taken care of. The public demonstrations will happen on July 10th of 2009! If not yet registered for ITEC's Free Electricity Program now is the time to do so...

Please enter your first name and primary E-mail location below to join the "JeffOtto.com Update" list:

To insure notification of updates please enter your primary Email below and add <admin@jeffotto.com> to your address book or white list.

Name:      Email:      
You will receive a confirmation Email to verify your subscription, thank you!

We hate SPAM as much as you do! Your Email will not be disclosed to anyone for any reason.




Contents:

arrow   ITEC's Free Electricity Program

arrow   The Plan To Introduce Free Electricity To North America

arrow   Four Options To Register For Free Electricity

arrow   Kansas State Congress Presentation

arrow   Maine & Idaho Attorney General Agreement

arrow   For Those Who Have Ears To Hear and Eyes To See by Dennis (BWT) and Alison (UCSA)

arrow   John Galt Show - Audio Presentation of Dennis Lee's Continuing Saga to Introduce Free Electricity

arrow   Periodic Audio Update On Our Progress By Dennis Lee At 212-461-8738

For a overview of the Free Electricity program (archived date March 12, 2007) by Dennis Lee please visit http://www.soundwaves2000.com/jgs/kingsandpriests/ password required is creation. The physics behind the technology was outlined on the March 26, 2007 archive on the same site.


Free, safe, clean alternative power for life!

    No, this offer is not something for nothing, too good to be true, or a joke, we are dead serious. In exchange for the use of your location and your grid access, ITEC will gladly supply your electricity needs. This is barter, you get what you want and we get what we want.

    The equipment is expected to produce 30 kWh each and every hour 24/7, an average all electric home at peak demand will only use about 2 kilo watts of the electricity produced. ITEC will sell the excess electricity back to your local utility through your grid connection.

    If the grid goes down, not a problem for you, your lights will still be on and your appliances (fridge, freezer, a/c, etc.) will remain fully operational. The equipment will adjust down to meet only your electricity needs, and ITEC will be temporally out of business at your location.

Major Benefits To You:

arrow   Uninterrupted supply of free electricity
arrow   Eliminate a major monthly expense (electric bill)
arrow   Convert everything to electric for free heating, cooling and hot water
arrow   Peace of mind (no rolling black outs)
arrow   Environmentally sound (no fossil fuel emissions)
arrow   Very minimal noise (like your existing a/c compressor)
arrow   Maintain your comfort level (dollars no longer dictate the thermostat setting)
arrow   Eliminate dependence on foreign oil

The ITEC's Free Electricity Program

    All households and Churches registered with ITEC's Free Electricity program will receive an allotment of 26,000 kWh per year, which is just under 2,167 kilowatt-hours per month. If you do a check of your electric bill, you will discover that allotment is more than adequate for the majority of homes.

    If you do have a rather large home and family or Church building, and you use more than the 26,000 kWh, any additional usage will be billed at the same price we sell power to the electric company. You will be paying wholesale, not retail, and only for your usage above your allotment!

    This state of the art motor and generator will be based upon permanent magnet technology. We expect the production model will be totally enclosed, approximately 3 feet square and relatively quiet (like your existing a/c compressor when running).

    The generator may either be installed indoors or out, preferably as close to your existing meter as possible. There will be no heat exchanger, no exhaust, no pollution, and no operating cost. There is a picture of the Sundance generator on site.

    Local electricians in your area will be called upon to install the equipment along with any government permits that may be required. A double throw switch will be installed in case of equipment downtime. If the generator should ever fail, you may switch back to your local electrical supplier at any time. ITEC will even pay your power usage until repairs can be made.

    The generator will not be free; the electricity will be, up to 26,000 kWh per year. ITEC will retain ownership of all the equipment and will cover all costs associated in installing and maintaining the system. If you change locations after your system is installed, you would be responsible for relocating the equipment (6-8 hours of a local electricians time).

    This program is available only to homeowners and renters located in the US or Canada (renters will need written permission from the property owner prior to installation).

    If for some reason ITEC is unable to install a generator at your location (local government, utility or property owner, etc.), this will not be a problem for you. All folks who have legitimately registered for this program will get their electricity for free when we are successful in bringing this technology to market. ITEC will simply install the equipment in another location and pay your electric bill up to the 26,000 kWh per year.

   Before bringing this technology forth to the American and Canadian people we need to reach critical mass in public awareness, which number has been set by the company at 1.6 million witnesses. All registrants (witnesses) will be required to attend a initial installation in their area on launch day, if unable to attend a representative with notarized authorization may fulfill this one and only obligation.

    The company will bring forth our technology once we obtain 1.6 million registrants willing to witness the event. For a description of the planned launch, please see the "Our Solution" section below.

Stay updated; subscribe to our Tech Update list!

Who Are You Guys

    There are three companies involved; Better World Technologies (BWT) is the research and development company, United Community Services of America (UCSA) is the dealer network through which the products and services are distributed to the public and, the International Tesla Electric Company (ITEC) will be our utility for electricity production and distribution.

Too Good to be True?

    Remember back when all the so-called experts proclaimed the world was flat? Did Columbus drop over the side into a big void? No, he discovered America? How about the Wright brothers? Did you know they were flying for 5 years before the President of the United States, under pressure, arranged for a demonstration at Kitty Hawk?

    The whole time all the so-called experts were declaring that heavier than air flight was impossible! People once thought it was absurd to talk long distance over wires, now we do not even need the wires. Is the same possible for electricity transmission? Nikola Tesla proved it 6 decades ago! The list goes on and on folks. We know that all things are possible through our Creator.

    If you would like more information on who and what we are and our current product line, take a look at our Free Look offer. The "Free Look" includes a public demonstration of the Sundance Generator of July 2000, a video of the current product line demonstrated, a video of ongoing products under research at Better World Technologies, 12 hours of video on CD ROM, 300 pages of documentation including a copy of "The Alternative", a full color catalog, and of course a registration certificate for your own generator.

    You have 2 weeks to review the materials provided. You may either support us by keeping the materials and forfeiting your $ 100.00 security, or return the materials to UCSA (we even pay the return postage). Complete details of the offer on the "Free Look" page.

Entrenched Interests

    Obviously there are some major big money interests that like things just the way they are. How about the current energy crunch in California, with the daily media warnings the problem could spread throughout the country? Is there really a electricity shortage, or is the real power behind the scenes just bilking the good old consumer cash cow again? Are they aware of this technology? You bet they are! Are they going to try and stop us? Anyway they can!

Our Solution

    Obtain a critical mass of public support, 1.6 million witnesses worth of public support throughout North America. That is the goal we must achieve before we launch. Upon accomplishing that goal, demonstrations will be held in major sports stadiums and public meeting places all across the country. Every household registered with this program will receive notification of the installation nearest them. Officials at ITEC believe that an event of this magnitude will be impossible to ignore or discredit.

Time is of the Essence!

    We need the support of the people to bring this technology out first to North America, and then to the world. We need you, we need your friends and family, we need the Churches! After the official launch, the installations will begin on a first come, first served basis. The only way to register now is through a donation to "His Covenant Ministries" or by purchasing any product offered on JeffOtto.com, obtaining and keeping the "Free Look" materials. Would you enjoy the peace of mind of an uninterrupted power supply with no fear of rolling blackouts or ridiculous rate increases. At Better World Technologies, "We don't want a New World, we want a Better World"!

Recruiter Conference calls:

As you listen in to the call please keep in mind you have to be affiliated with an authorized UCS of A dealer to participate in any promotions discussed and your dealer's representative is JeffOtto.com LTD, thank you

    The Recruiter Teleconference call (hosted by Dennis Lee, President and Director of Research at Better World Technologies) is on Thursday night from 7 to 9 PM (Eastern Time Zone - USA) at 1-646-519-5860 PIN 3560#. Available live & archived on the Internet site at www.soundwaves2000.com/jgs/clubs Password required is: thisisit

Stay updated; subscribe to our Tech Update list!

The Four (Now Three) Options For Registering In ITEC's "Free Electricity" Program

Please Note: There will be no Public Demonstrations in the States of Maine, Vermont & Idaho!  

Registrants located in the States of Maine, Idaho & Vermont will be required to travel to an adjacent state to fulfill their witness obligation at the public demonstrations.

Sorry - Sold Out

Order the "Declaration of Energy Independence" or DEI-DVD
Engine Modification

UCS of A's Free Look offer >>>

Sundance Generator

Purchase any product or service offered through JeffOtto.com Ltd

Just enter "FE Registration Requested" in the memo area of your order

Free Electricity Registration

A donation of $10.00 or more to "His Covenant Ministries" >>>

Make A Donation

Return to Better World Technologies

"Free Electricity" in the news if available:

Rural Electricity Projects Suffer Delay (This Day)Managing Director and Chief Executive Officer of the Rural Electrifi-cation Agency, Engr. Sam Gekpe has said about 46 rural electricity projects initiated by the Federal Government, have been abandoned.

Coalition forces say electricity production up but capacity still not enough (The Canadian Press via Yahoo! Canada News)BAGHDAD - The director of energy operations for coalition forces in Iraq says electricity production jumped more than 10 per cent in roughly the first six months of 2008 compared with the same period a year ago.

Featured Products For:
Mileage Calculator
MPG Calculator Tool


Stay Informed!
Subscribe to the
"JeffOtto.com Tech Update"
Name: 
Email: 

Emails disclosed to NOBODY!

Email  Notify Your Friends!

Affiliate Program